| 11/06/2011 | Warning Lights, Flooring, Cabinets, and Work Surfaces Installed. |
|  |
|  |
|  |
|  |
|  |
| 9/25/2011 | Storage Compartment Painted |
|  |
| 9/10/2011 | Worked on rear storage compartment (battery box, trim and shelving) |
|  |
|  |
|  |
|  |
| 8/28/2011 | Battery Box Installed |
|  |
|  |
| 8/21/2011 | Interior wall built |
|  |
|  |
|  |
|  |
| 7/24/2011 | Roof racks installed with fold-over antenna mounts, PA loudspeakers and floodlights. |
|  |
|  |
|  |
|  |
|  |
|  |
|  |
| 7/17/2011 | built step for side door |
| 7/11/2011 | returned scaffolding |
| 7/10/2011 | installed A/C unit on trailer |
|  |
|  |
| 7/9/2011 | removed roof vent, built ramps |
|  |
|  |
| 7/8/2011 | picked up scaffolding for work platform from Sunbelt rentals |
| 7/4/2011 | ladder rack accessories - lights, antennas |
| 7/2/2011 | ladder rack accessories - lights, antennas |
| 6/12/2011 | outside ladder rack installation, checked torque of all lug nuts |
|  |
|  |
| 6/5/2011 | working on 12V DC wiring rough-in |
|  |
|  |
|  |
| 6/4/2011 | working on 12V DC wiring rough-in |
| 5/30/2011 | completed 120V electrical rough-in, finished pulling 120V wire - wired power inlet and load center |
| 5/15/2011 | continued electrical rough-in work, pulled wire for lights and interior outlets |
| 5/14/2011 | began electrical rough-in, installed load center, power inlet box and exterior receptacles |
|  |
|  |
|  |
| 5/13/2011 | installed levels |
| 5/8/2011 | install vinyl graphics on rear doors |
| 5/1/2011 | installed leveling jacks, also finished removing interior sheet metal and plywood doublers. |
| 4/30/2011 | installed vertical clearance decals to front, removed rest of interior trim and wooden doublers |
| 4/23/2011 | removed some interior sheet metal and wooden doublers |
| 4/18/2011 | debut at MARC meeting |
| 4/17/2011 | install license plate |
| 4/17/2011 | Install exterior lettering (both sides) |
| 4/5/2011 | Picked up new MARC trailer |
|  |
|  |
|  |
|  |